4/17/2011

04_Making of

Today I started working on the setting. The first step is to construct a room in the presentation space. Thanks to my dad and his friend, they set a 8ft* 6ft room for my work. Due to the lack of the budget, the room has no ceiling and no decoration on its outlook. To provide a dark area, I will switch off the lights during my presentation. 

It was hard to install the water pipes in the room. In a proper way, people use glue to fix the pipes and the fittings. However, I could not. I planned to hide the speakers and the cables in the sculpture. Without the glue, the pipes did not keep a fix position for a long time. And I needed to fix the previous part and add the new one at the same time on my own. It was a "mission impossible" for me. I just finished a 1/3 part for almost four hours.

Luckily, my dad came and helped me to hold the pipes. Then I could add them, instead of keeping adjustment on the "naughty" pipes. At the end, I could finish it on schedule. 

Now I can move on to the next step: Audio interface, cables and speakers. Yeahhhhh

Special Thanks to my dad and Uncle Lung

The lock of the room








I started installing the water pipes in the room

No decoration on the outlook  

Messy room

 1:12 model 

Butterflies will leave in the end of April